CH-7 2015 Bulk Sample Photo Gallery

 Simeone Akpik fuelling test at Sunrise camp, January 2015
Simeone Akpik fuelling test at Sunrise camp, January 2015
 Snowcat clearing sunrise Hercules ice strip, January 2015
Snowcat clearing sunrise Hercules ice strip, January 2015
Gary Eesamaile and Amie Nashalik at work, January 2015
Gary Eesamaile and Amie Nashalik at work, January 2015
Runway crew
Runway crew
Challengers on the Iqaluit-Chidliak trail
Challengers on the Iqaluit-Chidliak trail
Dave Pickston, post-snowstorm
Dave Pickston, post-snowstorm
DC-3 and 737 at Sunrise camp
DC-3 and 737 at Sunrise camp
DC-3 taking off
DC-3 taking off
DC-3 delivering bulk fuel
DC-3 delivering bulk fuel
Discovery Camp
Discovery Camp
Hélicarrier's A-Star 350B3 and the Nolinor 767
Hélicarrier’s A-Star 350B3 and the Nolinor 767
Hercules taxiing for takeoff
Hercules taxiing for takeoff
Twilight at Discovery camp
Twilight at Discovery camp
Large-diameter drill at CH-7
Large-diameter drill at CH-7
Bonnie Etuangat and Dave Clarke of Nuna Logistics
Bonnie Etuangat and Dave Clarke of Nuna Logistics
Loading the 767 with sample bags
Loading the 767 with sample bags
Lowering hammer at start of hole
Lowering hammer at start of hole
Large-diameter drill rig in operation at CH-7
Large-diameter drill rig in operation at CH-7
Last bulk sample bag filled
Last bulk sample bag filled
Loading sample bags into the DC-3
Loading sample bags into the DC-3
Large-diameter drill rig at sunset
Large-diameter drill rig at sunset
Last drill run
Last drill run
Unloading equipment from the Hercules
Unloading equipment from the Hercules
Fred Welke and Lindsay Smith granulometry testing
Fred Welke and Lindsay Smith granulometry testing
Moving supplies to CH-7
Moving supplies to CH-7
Ben St-Onge from DGI performing caliper survey
Ben St-Onge from DGI performing caliper survey
Heavy equipment at Sunrise camp
Heavy equipment at Sunrise camp
Staff from Pangnirtung leaving camp
Staff from Pangnirtung leaving camp
Loading drilling equipment into the Hercules in Iqaluit
Loading drilling equipment into the Hercules in Iqaluit
Challengers pulling water tanks to CH-7
Challengers pulling water tanks to CH-7
Loading drill supplies onto the Hercules
Loading drill supplies onto the Hercules
The rig and sample bags at hole LD03
The rig and sample bags at hole LD03
Max Ryan adding a diamond tracer to a sample bag
Max Ryan adding a diamond tracer to a sample bag